Key Dates
Field Surveyors
During the next couple of weeks, you may see some people working along the Noank Main Street. These surveyors are collecting in-field data of the existing layout and topography to get a better understanding of the corridor conditions.
Geotechnical Exploration
During the next couple of weeks, you may see some people working along the Noank Main Street. These geotechnical technicians are collecting in-field data and samples of the existing soils and ledge depth to get a better understanding of the corridor conditions.
Conceptual Design and Public Meeting
Please join us! During the public meeting, there will be a presentation of the concept designs and then time for comments and questions. 134 Groton Long Point Rd, Room #1, Groton, CT 06340 at 7pm.
Preliminary Design and Public Meeting
After the conceptual design public meeting, Wright-Pierce and the Town of Groton will review the comments provided from the neighborhood and begin drafting the preliminary design for the Noank Main Street corridor. A public meeting will be scheduled to invite everyone to review the drawings and provide feedback. Exact date and time for the public meeting to follow.
Final Design and Public Meeting
After the preliminary design public meeting, Wright-Pierce and the Town of Groton will review the comments provided from the neighborhood and begin drafting the final design for the Noank Main Street corridor. A public meeting will be scheduled to invite everyone to review the drawings and provide feedback. Exact date and time for the public meeting to follow.
Anticipated Construction
After the final design public meeting, Wright-Pierce and the Town of Groton will review the comments provided from the neighborhood. All permitting applications will be filed for approval. Once the permitting applications are approved, the construction documents will be made available for contractor bids. Anticipated construction start date will be provided once a qualified contractor is awarded the construction contract.